What are typical delivery timeframes to FL (Tampa area).

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

CodeOrangeGen3

Active Member
Joined
May 13, 2021
Posts
99
Reaction score
71
Location
Austin, TX
I have a Gen3 scheduled to build on 8/23. My question is about delivery times. Since my dealer is near Tampa I would think the delivery would take a while. I saw a Gen3 delivered to PA that took 3 weeks from build. Should I double or triple that, or does the physical distance not make a huge difference? Does anyone know if they load the trains for regional deliveries? In that case it may not be much longer. Or do they just hit the closest stops from the plant? Either way I'm just glad I have one coming, but have been curious about this.
 

Jdselig

Full Access Member
Joined
Feb 6, 2021
Posts
153
Reaction score
333
Location
Appleton, WI
I have a Gen3 scheduled to build on 8/23. My question is about delivery times. Since my dealer is near Tampa I would think the delivery would take a while. I saw a Gen3 delivered to PA that took 3 weeks from build. Should I double or triple that, or does the physical distance not make a huge difference? Does anyone know if they load the trains for regional deliveries? In that case it may not be much longer. Or do they just hit the closest stops from the plant? Either way I'm just glad I have one coming, but have been curious about this.
Actually the one in PA from build day to dealer delivery was less than one week.
 

Token

Active Member
Joined
Feb 8, 2018
Posts
62
Reaction score
109
Location
Fayetteville, AR
Think UPS Ground times if the truck is actually moving. It's QC checks and getting the trucks on/off the trains that takes so long. I've seen vehicles sit at rail yards for a month+. But the actual movement of your truck to FL should only take 3-5 days if it stays moving with no hang ups...or derailments.
 

Sephiroth

Well-Known Member
Joined
Jun 25, 2021
Posts
227
Reaction score
298
Location
Nibelheim
Think UPS Ground times if the truck is actually moving. It's QC checks and getting the trucks on/off the trains that takes so long. I've seen vehicles sit at rail yards for a month+. But the actual movement of your truck to FL should only take 3-5 days if it stays moving with no hang ups...or derailments.
Do you know if our order qualifies for Amazon prime??
 

Duck

Full Access Member
Joined
May 12, 2021
Posts
113
Reaction score
94
Location
Tampa
I have a Gen3 scheduled to build on 8/23. My question is about delivery times. Since my dealer is near Tampa I would think the delivery would take a while. I saw a Gen3 delivered to PA that took 3 weeks from build. Should I double or triple that, or does the physical distance not make a huge difference? Does anyone know if they load the trains for regional deliveries? In that case it may not be much longer. Or do they just hit the closest stops from the plant? Either way I'm just glad I have one coming, but have been curious about this.

Live in Tampa, ordered a 37 from a dealer just outside of Tampa and I also was given 8/23 as build week so I am very interested in this thread
 

Raptor911

FRF Addict
Joined
Aug 9, 2012
Posts
4,690
Reaction score
2,252
Location
Ashburn, VA
There is rhyme or reason to delivery times. I have ordered multiple cars from ford and sometimes it takes 4 weeks and my 2019 Raptor took 4 months.
 
Top