My dealer has several (more than six) allocations. So far two R's have been delivered, one is built awaiting shipment. Mine is next - with an available allocation.
My priority code was moved to 01 AFTER February 1.
I echo the fact that Priority Code means everything at the dealer level. It determines the pecking order at your dealer if your dealer has allocations available.
Many on this Forum are reporting that their R's with an existing scheduled date for production (although some were moved to later dates), have been built, shipped and delivered recently, so there is not a hold on manufacturing the R, just looks like there is a hold on any new scheduling.